Dear all,
Is there any option to choose PRT while doing production posting / confirmation?
The scenario is that we are manufacturing a part by more than one PRT (Mould / Die). If we attached more than one PRT as a equipment in the routing for a particular operation, life time for the same will be calculated for all the attached PRT's.
So i need to choose the correct PRT while doing confirmation. Please clarify my doubt at the earliest.
Thanks & Regards,
Nellaiappan N.P.