Hi,
I need information and help on suitable SAP user exit or enhancement for Production order for this below scenario.
- While creating production order in CO01 system does material status checks if master data is fine then i can save the the production order. But if a BOM component had been updated with Discontinuation indicator in MPR4 view and details of follow up material updated in Material master then system pops up message informing
"The component XXXX has material status Phase out ROH. Do you still want to adopt the component?".
- Then there is option of Yes, No and Cancel in the Pop Up message.
- If i click on Yes then new component gets replaced with discontinuation material and then i can save the production order
- If i click on No then new component will not get replaced and production order should not be saved
If you have come across this scenario and would like to know which User exit or enhancement can be used