Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 8851

Re: PI version appropiate for integration with Successfactor

$
0
0

Hi Benoy,

 

1. PO can be integrated with SuccessFactor?

Yes. SAP has released a new adapter called the “SFSF Adapter” for SAP NetWeaver Process Integration (PI) on 17 Feb 2014.


Compatibility Matrix:
SAP NetWeaver Process Integration, connectivity add-on 1.0 SP0 is compatible with:

  • SAP NW PI 711 >=SP12
  • SAP NW PI 730 >=SP10
  • SAP NW PI 731 >=SP09
  • SAP NW PI 740 >=SP04

Refer:

SuccessFactors (SFSF) Adapter for SAP NetWeaver Process Integration

 

 

2. PI 7.3.1 and PI 7.4  are same I mean are they both called PO because PI 7.3.1 with SP 8( not sure ) is also called PO

>>>If you have Single stack PI installation along with BPM & BRM components then these 3 clubbed together are called as PO (Process Orchestration). Please refer following for 7.31 SP 08

What's new in Process Orchestration 7.31 SP08/7.4 SP03


Hope it helps


Regards,

Azhar

 


Viewing all articles
Browse latest Browse all 8851

Trending Articles