Many Many thanks Ludek,
As i had succeeded at end.
All the mess was due to my system was loaded with many software.
Sap Crystal Reports,Sap BOBI 4.0 , SAP GUI so the mess was just for that but
i did not uninstall any of my softwares still done nicely.
Your solution was perfect
If you do not need managed reporting (e.g.; reports will be loaded from path not via CID from BI), you do not need scheduling and administrative SDKs, then all you need is VS 2010 or higher and SAP Crystal Reports, Developer Version for Visual Studio .NET (CRVS). On the development computer, use the "Install exe", not the MSI as the MSI will not integrate fully into VS.