hi
When a project/wbs/network get the status, i.e. ACAS CLSD CNC CNF MANC NTUP PRC all components appare as "deleted" both in CJ20N and in the CN52N and when looking at the report how is it possible which actually ha been deleted from the activity and which as not?
If this is standard SAP, why?
Thanks
Kjell