Hi All,
I have the follwing setup of BOMs/Routings:
BOM:
superBOM Routing
subBOM 1 operation 0030 phantom item
component 1.1 operation 0020
component 1.2 operation 0010
subBOM 2 operation 0030 phantom item
component 2.1 operation 0040
For the materials subBOM 1 and subBOM 2 I have set the Special Procurement type 50 (Phantom assembly) in MRP2.
I created first the subBOMs and then the superBOM.
My issue is that in CA03 or CA02 all of the component assignments are disappeared.
When I create a production order to the superBOM then all components will be assigned to operation 0010 in sequence 0. (first operation)
In some cases all components are assigned as an inheritance in the production order to the operation 0030 (like the phantoms has).
I checked the SAP Notes and I just found one with a report: 352375 - Item conversion in phantom assembly
Is not there any solution which I can use for multi-level BOMs where I only want the lowest level explosion with the lowest level component assignments?
We would not like to MRP the materials for the subBOMs and we only need to have the lowest level components in the production order.
Thank you in advance!
Best regards