Hi All,
I am new to DS, could you please help me out with in depth details of each transformation of 4.2 version
Thanks In Advance,
Harshitha
Hi All,
I am new to DS, could you please help me out with in depth details of each transformation of 4.2 version
Thanks In Advance,
Harshitha
Firefighter Workflow is a single stage workflow - I am also facing the same issues. I am getting the workflow emails and notofication email - BUT when we goto inbox and click on the mail, we get below error: Stage configuration not defined for path stage type 'CL_GRAC_SPM_AUDIT_REVIEW' version '000001'
I check the stage and all is fine:
Seq: 001
Stage Config ID: GRAC DEFAULT STAGE
Agent ID: GRAC_SPM_CNTRL_AGENT
Anyone approval
Routing enabled - NO
The task settings:
Stage Config id: GRAC_Default_STAGE
Agent ID: GRAC_SPM_CNTRL_AGENT
Confirm Approval and Confirm Rejection are CHecked.
Routing Confing Check OK - NOT checked.
Can someone please help??
Regards
Ashish
<removed by moderator>
Message was edited by: Gali Kling Schneider
hi, could you please provide me with the link to the tool itself, I'm unable to find the sql to hana script migration tool anywhere in the download section.
my email is <removed by moderator>
Message was edited by: Gali Kling Schneider
Hi Experts,
I have a Data Storage object(DSO) and wanted to ask if I can register/register this(DSO) as Source databasis (in BCS Customizing) in UCWB.(e.g. to do a load from datastream from this into the transactional BCS Cube) Can you let me know if this is possible /feasible? If not what alternatives I have when I have a DSO?
Any hints welcome. Thanks in advance,
murat
Hi,
I just posted the IR document and i am getting the balance as freight clearing in MR11.
Please suggest further.what will be the solution?
Hi Sreenivas,
You can try JAVA mapping to meet your requirement.
Follow the below link to create a java mapping from scratch.
Java Mapping in SAP PI 7.11 - LukCAD
If you don not want to use namespace in mapping, you can follow below link
How to remove namespaces in Mapping - XI | SCN
Thanks,
Krupa
Hello Experts,
I would like to ask regarding the scheduling agreements which are affect the production planning.
So the problem:
I have some customers who sometimes sending their orders so that the delivery date is already in the past when the IDOC arrives (e.g. today is 13/04/2014 and the delivery date of IDOC is 02/02/2014... it is very annoying and to top it all completely impossible to deliver on time), due to this incidents the backlog management is not so easy.
Is there any kind of option to change somehow the scheduling agreements so that if the delivery date of IDOC (when it is arriving) is earlier the than "Today" then the system overwrite it and the new delivery date will be "Today + Delivery duration"?
The time fence setting in MM is not allowed option.
Thanks in advance the response!
Hi Gurus
when i create a billing document i am getting this error. any input on this
please help
thanks
Hello!
Solution is work. I fased with issue "Cannot open log: /usr/sap/trans/log/CC000016.A03"
Next according reply i created directory with full access rules. And client copy strted correctly! Thanks
My system was system copy,because no directory trans
Hi Enrique,
You can try the below FM before using variant:
RS_CHANGE_CREATED_VARIANT - Change the contents of variant
Pass CURR_REPORT = Report Name, CURR_VARIANT = Variant Name, ONLY_CONTENTS = 'X' and fill tables parameter VARI_CONTENTS with the contents to be updated. For example.
SELNAME | P_MATNR |
KIND | P |
SIGN | I |
OPTION | EQ |
LOW | 1000 |
HIGH 2000
Regards
Gangadhar
Hi,
While creating Purchase order of Type RTN or STO, the client wishes to Select the Ship to partner manually if more than one Ship to Partner is assigned to the Customer Master Data ( in Customer -> Sales area Data -> Partner Functions -> Ship to Party )
On selection of one of the goods recipient assigned to Customer in PO header the Customer in Shipping Tab in all the PO items and corresponding Delivery Addresses needs to be updated.
My requirement is somewhat described by SAP Note 652763 but that cannot be used in ME21n.
Kindly help in this regard on how to achieve the functionality.
Regards,
Hemant
Hello Gurus,
Please help me When i do double click on ALV Report output , it is going back to Selection screen, actually its working as Back button. Now how to stop it.. I did debugging but i cannot trace it.
If you want to have 250 char field.. try Append structure to ITCPO, in that append structure u can have field which you can field size of any desired length. Now populate that field..
You can format it like:
Cast(Date_Field,’datetime’)
It should return you the date in below format: YYYY.MM.DD HH24:MI:SS
Hi Pradip,
Iam facing same problem. I pasted all screenshots in my previous thread Some said to check rhinte00 reports but its not working its not appearing in an infotype 0001
I checked settings in backend still its not working
After running lsmw i ran rhinte10 report In that I can see "No batch input program".
I dont know where it went wrong how its going to work still in delimma
Hi All,
I want to add new fields in the incident offline form I already added the fields in the report incident online form.so that fields are available in the main table please let me the way to add them into the offline form EHHSS_INC_AIF_INC_OFFLINE_REP
.
Regards
Luxmi
refer the below document. page no 24.
Hi Nagarajan,
thanks for you answer, I've done it and i'm getting same error.
After the row's update is a database restarted needed?
Regards,
Hi Anshu!
Thanks for the tip, actually it seems the problem. I didn't face it before because, when you create a std DSO by copy from a Direct Update one, the error does not come up!
Thank you very much!
Then what is the issue now, Same approach is not working here. ?
try to use matrix layout all places.