Quantcast
Channel: SCN: Message List
Viewing all 8851 articles
Browse latest View live

IllumLoginName/Password no long working in MII 15

$
0
0

Hello,

 

We recently had a system upgrade, from MII 12.x to MII 15.x. It seems the IllumLoginName/Password behavior is changed, because in MII 12.x, I can use the bellow URL without the additional Login window:

 

http://xxxxxxxxx:51000/XMII/CM/MHP_HI_REP/lifecycle.irpt?IllumLoginName=report_user&IllumLoginPassword=ha…

 

But int he MII 15.x, I tried to make the same URL like bellow

http://xxxxxx:50000/XMII/CM/MHP_HI_REP/lifecycle.irpt?IllumLoginName=report_user&IllumLoginPassword=…

 

It is unfortunately no long working, I also tried the bellow solution from SAP Programmatic Logins,and made the URL like bellow

http://xxxxxxx:50000/XMII/Illuminator/PortalLogin.jsp?target=/XMII/CM/MHP_HI_REP/lifecycle.irpt&IllumLoginName=Administr…

 

But still not working, I have no idea anymore how to make the URL without the login window

 

Thanks a lot for the help

Leon


Re: Incorrect Tax calculation UK payroll

$
0
0

Can u please check RETRO feature in the payroll and provide the screenshot if possible pls.

Re: Delegation Of Authority following Plant No

$
0
0

Hi,

   Please check whether the authorization method can fulfill your requirement. You may check the authorization object: M_BEST_WRK and create the roles as per requirement.


Regards,

AKPT

User group information is not visible in Risk analysis reports

$
0
0

Hi All,

 

User group information is not visible in my Risk analysis reports

 

I found below note. But I am not sure if this is applicable for GRC 10.1 also. Kindly advise.

 

1654626 - Usergroup and Resource description missing in detail report

 

NW 7.4 and GRC10.1

Re: APO SNP planning with scheduling agreement

$
0
0

I have already gone through all these help documentation but no where it clearly mentions that for SA which are planned and released in APO, output should be triggered from APO only and not from ECC.

Re: First Record of File Adapter

$
0
0

Hi Rama,

 

Keep Document Offset as 'Blank'.

 

http://www.riyaz.net/blog/wp-content/uploads/fcc-complex-sender.jpg

 

 

Document Offset:

Specify the number of lines that are to be ignored at the beginning of the document. This enables you to skip comment lines or column names during processing. If you do not make an entry, the default value is zero lines.

 

Regards,

Nabendu.

Re: Visual Composer

$
0
0

I am using Chrome and the IE tab extension.

Inbound Delivery- There are no items in sales document

$
0
0

Hi Team,

 

I am creating inbound delivery using VL10 for STPO and getting error :  There are no items in sales document $ 1

 

STPO error.PNG

 

I tried searching forum but could not find anything here my PO look like

 

PO.PNG

Thanks!


Re: How to create a custom Fiori App

Re: Message"Purchasing document exist(EKKO)” for vendor which has closed PO/PR and in archived status at the time of archiving VMR

$
0
0

If you have POs for that vendor in table EKKO then you have not fulfilled the prerequisites as it is cleary written

  1. PO closed and archived

 

An archiving process is only round and completed if the records that were archived got also deleted from the tables.

without that you have just created a copy of all old business cases  and made the database even bigger instead of smaller.

Good combination with SAP BASIS

$
0
0

Hi Experts,

 

I am a fresher working in SAP BASIS since a year. I would like to learn a new skill with that in parallel. Could you please suggest which module of SAP will be good. Can I take up SAP BI/BO?

 

Please suggest me and also guide me how can I start learning the new module. I would like to be techno-functional.

 

Best Regards,

Amarnath

DQM Initial Match code error /FLDQ/RSADRINIBM

$
0
0

Dear all,

 

the /FLDQ/RSADRINIBM report fails with T061 error (communication error)


The RFC server log file (flrfcsrv_log.txt) says that the RFC server is operational:


23.07.2015 16:37:28 Status: All required SAP system ID *** Data Services system localhost jobs are active

RFC host: ***

DS host: localhost

SAP system ID: ***

SAP program ID FLRFCBTC

 

 

***CHANGED*** Data Services job "Service_Realtime_DQ_SAP_Create_Break_Keys" is running - state = SERVICE_STARTED

***CHANGED*** Data Services job "Service_Realtime_Batch_DQ_SAP_Name_And_Address_Match" is running - state = SERVICE_STARTED



but when calling the Get_potential_batch_matches some error happens.


23.07.2015 16:41:54 Error: Unable to start Data Services batch match process. Error message = "Error running batch job."

23.07.2015 16:41:54 Technical Error #898: An error occurred processing the GET_POTENTIAL_BATCH_MATCHES request

23.07.2015 16:41:54 Error: Unable to start Data Services batch match process. Error message = "Error running batch job."

23.07.2015 16:41:54 Error: SAP system *** terminated its connection with the RFC Server ***. Gateway server terminated or currently experiencing a network issue

 

The Real time service  'Service_Realtime_Batch_DQ_SAP_Name_And_Address_Match' is running properly.

The Enable Validation idea given in  note 1511841 - Batch Match job failing - DQM for SAP is unchecked by default.

 

Any help is welcome.

 

Thanks in advance

Re: Regrading keywords flag

$
0
0

Hi,

 

As Seshu said, this can only be done in transformation level..

 

Regards,

Loed

Re: Error handling for work item 00000119XXX Message no. SWF_RUN630

$
0
0

Hi Shivraj

 

The step in error calls task TS00007913 -> which calls method SUBWF1DETERMINE of object FIPP.

There is only one exception for this method seen in SWO1 - which is to raise Message FP-160, which is -  Error in workflow Customizing for document parking (tranasction OBWE)

Check if you have maintained all customizing in OBWE. Check if you have done the requisite config for approver determination.

 

If you want to go down the cumbersome way - debug FM PRELIMINARY_POSTING_SUBWF1_DET. This is the cone called from method SUBWF1DETERMINE of object FIPP.

 

Regards,

Modak

Re: Crystal Reports stand-alone designer vs VS 2010 Version

$
0
0

Thanks Chris,

 

That's better.

 

More details:

 

What OS are you they using?

If after installing CR 2013 and you do a repair install of CR for VS does that fix the problem?

 

Ludek and I are trying to duplicate this....

 

Thanks again

Don


Re: contact person in xk03

$
0
0

You should be able to create contacts using relationships.

Re: Mobilink Communication Error - code 48

$
0
0

Hi Andreas I have tried the code mentioned in Note 1928774, but still getting Mobilink communication error 24. We have tried with the same MBO package and the same client application with the same certificate on IOS simulator and android simulator. Synchronization works fine on IOS. I am thinking whether this could be an issue with SQLAnywhere 16 as mentioned in Note 2134354 07-23 15:29:53.577: I/MocaLog(680): UltraLiteJ Error[-1305]: MobiLink communication error -- code: 24, parameter: , system code: 336134278 07-23 15:29:53.577: I/MocaLog(680): com.ianywhere.ultralitejni16.implementation.JniException: UltraLiteJ Error[-1305]: MobiLink communication error -- code: 24, parameter: , system code: 336134278 Our certificate is a Verisign certificate. Certificate - .crt format - IOS - issue with reading certificate

Re: how to let MD07 not consider project stock

$
0
0

Hello

 

As I pointed on my previous answer, BAdI MD_CHANGE_MRP_DATA can be used for such purpose. Please check the links previously mentioned.

 

BR

Caetano

CK40N won't explode in SAP-APPL 617

$
0
0

Colleagues,

 

We are upgrading our system from 606 to 617. In 606, CK40N explosion step will explode our BOMs. In 617, it won't. I am creating a note to SAP, but also posting here in hopes of a quicker response.

 

606 example:

Selection step -- enter plant code, material type, "always recost". 15 materials are selected.

Explosion step -- BOM is exploded and components now included, so total material count is 30.

Costing step -- 30 materials are costed.

 

617 example:

Selection step -- (same). 15 materials are selected.

Explosion step -- executes, but BOM components are NOT included. Total material count is still 15.

Costing step -- 15 materials are costed.

 

We have not changed our materials, our configuration, or our procedures. I cannot find any OSS notes about this problem. The closest note is 2048050, and our materials conform to the requirements described in that note.

 

This is not going to stop our upgrade, because we usually select all desired material types and do not explode. (I do the explosion for thorough testing.) However, this system behavior is incorrect.

 

Can anyone help? Thanks in advance.

Re: Customizing to display Planned PGI time in delivery

$
0
0

Hello D Singh,

 

Thanks for the valuable information.

 

But i need to know, how to update the GI time automatically in sales order.

 

We have number of schedule lines assigned for a single order, it is very difficult to update all of them manually.

 

Please suggest, what are the related configurations to be done in order to update GI time automatically.

 

 

Regards,

Mohan Krishna

Viewing all 8851 articles
Browse latest View live




Latest Images